Blasting measures engineering

Blasting measures engineering

  • Categories:case study
  • Author:
  • Origin:
  • Time of issue:2019-05-05 15:57
  • Views:8

(Summary description)Description  Excerptedfromthe"NewBlastingProjectConsumptionQuota"editedbyChinaEngineeringBlastingAssociationGYD-102-2008Blastingengineeringbelongstospecialtechnicalengineering,inadditiontotheimplementationofthe"BuildingandInstallationEngineeringCostProjectComponents"issuedbytheMinistryofConstruction(MinistryofConstruction,No.206,2003)Inadditiontothemeasuresspecifiedinthedocument,theprojectsthatshouldbeincludedinthemeasuresare:blastingengineeringdesign,safetyassessment,supervisionandmonitoring.  Theblastingsafetyprotectionmeasuresareasfollows: categoryprojectnameSpecificrequirementsBlastingtestBlastingvibration,shockwave,noiseandothertestingitemsSpecialtestingequipmentandanalysissoftwareforblastingvibration,pressureornoise,theinstrumenthascalibrationcertificateandcalibrationcertificate.ShockabsorptionmeasuresDampinggrooveCanbeexcavatedattheedgeofthesourceorprotectionobject,shouldhaveacertaindepthShockabsorbingholeCanbeplacedattheedgeofthesource,thedepthofthedampingholeisnotlessthanthedepthoftheblastholePre-crackCanbeplacedattheedgeofthesource,thepre-crackdepthisnotlessthantheblastholedepthSeismicreinforcementandcushioningmeasuresnecessaryforprotectionTemporaryorpermanentreinforcementShockwaveprotectionBlockingwallBrickwalls,stonewalls,etc.canbeused,andthewallshouldhaveacertainheightandstrengthtopreventdamagefrombadweather. Underwaterbubblecurtain.BlockcurtainCanbemadeofrubber,wood,ironandothermaterialsReduceblastingnoiseExposedblastingequipmentcoverCoveringmaterialsinclude:sandbags,woodboards,ironplates,etc.DustprotectioncoverCoveringmaterialsinclude:waterbags,etc.OcclusionClosetheprotectiveobject,setthewaterfogscreentoblockwateringSettingaspraywatersystemnearthesourceHazardousgasprotectionpredictionExperimentalanalysisofharmfulgascontentinexplosivesexplosionmonitorWithspecialtestingequipmentandanalysissoftware,theinstrumenthasacalibrationcertificate.RollingstoneprotectionRetainingwallSandbagretainingwall,masonryretainingwall,etc.ShelfSteelpiperacks,woodenracks,bambooracks,etc.HangingnetMaterialsinclude:nylonmesh,wiremesh,bambooraft,smallplate,ironplate,etc.CutstoneditchItcanbesetatdifferentpositionsfromthesourcetotheprotectionobject.Thestonechannelshouldhaveacertaindepthandwidth.RollingstoneareareinforcementSprayanchorreinforcementorotherreinforcementmeasures  Billingmethod:Accordingtotheapprovedconstructionplanandprotectivemeans,refertothemethodsgenerallyusedandthematerialsusedintheprojectsite,andcalculateaccordingtotheactualsituation.  Testblastingengineering  Accordingtothetestplanandthescaleofthetestblastingproject,thedesignandconstructioncostswillbecalculatedseparately.  Othermeasuresforblastingengineering  Accordingtotheparticularityoftheblastingproject,thefollowingblastingmeasuresshouldalsobeincludedinthepreparationofthetotalcostoftheblastingproject:  1Blastingengineeringdesignandassessmentfee. Theblastingdesignshallbeundertakenbytheunitwithdesignqualification.Thegeneralopenblastingshallbechargedaccordingtothedirectcostoftheblastingprojectof3%to5%;thedesignofthedemolitionblastingshallbedetailedforthebuildingstructure,thematerialsused,thesurroundingenvironmentandthefacilitiesthatmustbeprotected.Intheinvestigation,thebillingiscalculatedwithin10%ofthedirectcostoftheblastingproject,andtheClassAprojectismultipliedbyafactorof1.1accordingtothelevelspecifiedintheblastingsafetyregulations. Thedesignofchamberblastingrequirestopographicsurvey,geologicalsketching,sectionandresistancelineretesting,etc.Thebillingiscalculatedwithin10%ofthedirectcostoftheblastingproject.  2Blastingsafetyassessmentfee. Theblastingprojectapprovalunitentruststheunitorpersonnelwiththecorrespondingqualificationleveltocarryoutthesafetyassessmentoftheblastingproject. Thefeecollectionprincipleisbasedonthecostthatcansupporttheevaluation.Thechargingstandardisbasedonthedirectcostoftheblastingproject.Theevaluationfeeofdirectcostlessthan100,000yuaniscalculatedat5%;the10,000-100millionyuanis5%.3%ofthecalculation;100to5millionyuanto3%. 1%oftheproject,theprojectofmorethan5millionyuan,accordingtothenatureoftheproject,thedifficultyrate,therateisnotmorethan1%. ThedifficultyfactorfortheincreaseofthefeefortheClassAblastingprojectspecifiedintheblastingsafetyregulationsis1.1.  3Specialsupervisionfeeforblastingproject. Theprojectsupervisionshallbecarriedoutbytheblastingsupervisionunitwiththecorrespondinglevelofqualification. Theprojectconstructionunitemploysandsignstheprojectsupervisioncontract. Thebillingstandardiscalculatedbasedonthedirectcostoftheblastingproject.Theprojectwithin100,000yuaniscalculatedtobemorethan10%,theprojectwith10to1millionyuaniscalculatedfrom10%to5%,andtheprojectwith100to5millionyuaniscalculatedas5to5%.3%;projectswithaninvestmentofmorethan5millionyuanarecalculatedtobelessthan3%. ThedifficultyfactorfortheincreaseofthefeefortheClassAblastingprojectspecifiedintheblastingsafetyregulationsis1.1.

Blasting measures engineering

(Summary description)Description  Excerptedfromthe"NewBlastingProjectConsumptionQuota"editedbyChinaEngineeringBlastingAssociationGYD-102-2008Blastingengineeringbelongstospecialtechnicalengineering,inadditiontotheimplementationofthe"BuildingandInstallationEngineeringCostProjectComponents"issuedbytheMinistryofConstruction(MinistryofConstruction,No.206,2003)Inadditiontothemeasuresspecifiedinthedocument,theprojectsthatshouldbeincludedinthemeasuresare:blastingengineeringdesign,safetyassessment,supervisionandmonitoring.  Theblastingsafetyprotectionmeasuresareasfollows: categoryprojectnameSpecificrequirementsBlastingtestBlastingvibration,shockwave,noiseandothertestingitemsSpecialtestingequipmentandanalysissoftwareforblastingvibration,pressureornoise,theinstrumenthascalibrationcertificateandcalibrationcertificate.ShockabsorptionmeasuresDampinggrooveCanbeexcavatedattheedgeofthesourceorprotectionobject,shouldhaveacertaindepthShockabsorbingholeCanbeplacedattheedgeofthesource,thedepthofthedampingholeisnotlessthanthedepthoftheblastholePre-crackCanbeplacedattheedgeofthesource,thepre-crackdepthisnotlessthantheblastholedepthSeismicreinforcementandcushioningmeasuresnecessaryforprotectionTemporaryorpermanentreinforcementShockwaveprotectionBlockingwallBrickwalls,stonewalls,etc.canbeused,andthewallshouldhaveacertainheightandstrengthtopreventdamagefrombadweather. Underwaterbubblecurtain.BlockcurtainCanbemadeofrubber,wood,ironandothermaterialsReduceblastingnoiseExposedblastingequipmentcoverCoveringmaterialsinclude:sandbags,woodboards,ironplates,etc.DustprotectioncoverCoveringmaterialsinclude:waterbags,etc.OcclusionClosetheprotectiveobject,setthewaterfogscreentoblockwateringSettingaspraywatersystemnearthesourceHazardousgasprotectionpredictionExperimentalanalysisofharmfulgascontentinexplosivesexplosionmonitorWithspecialtestingequipmentandanalysissoftware,theinstrumenthasacalibrationcertificate.RollingstoneprotectionRetainingwallSandbagretainingwall,masonryretainingwall,etc.ShelfSteelpiperacks,woodenracks,bambooracks,etc.HangingnetMaterialsinclude:nylonmesh,wiremesh,bambooraft,smallplate,ironplate,etc.CutstoneditchItcanbesetatdifferentpositionsfromthesourcetotheprotectionobject.Thestonechannelshouldhaveacertaindepthandwidth.RollingstoneareareinforcementSprayanchorreinforcementorotherreinforcementmeasures  Billingmethod:Accordingtotheapprovedconstructionplanandprotectivemeans,refertothemethodsgenerallyusedandthematerialsusedintheprojectsite,andcalculateaccordingtotheactualsituation.  Testblastingengineering  Accordingtothetestplanandthescaleofthetestblastingproject,thedesignandconstructioncostswillbecalculatedseparately.  Othermeasuresforblastingengineering  Accordingtotheparticularityoftheblastingproject,thefollowingblastingmeasuresshouldalsobeincludedinthepreparationofthetotalcostoftheblastingproject:  1Blastingengineeringdesignandassessmentfee. Theblastingdesignshallbeundertakenbytheunitwithdesignqualification.Thegeneralopenblastingshallbechargedaccordingtothedirectcostoftheblastingprojectof3%to5%;thedesignofthedemolitionblastingshallbedetailedforthebuildingstructure,thematerialsused,thesurroundingenvironmentandthefacilitiesthatmustbeprotected.Intheinvestigation,thebillingiscalculatedwithin10%ofthedirectcostoftheblastingproject,andtheClassAprojectismultipliedbyafactorof1.1accordingtothelevelspecifiedintheblastingsafetyregulations. Thedesignofchamberblastingrequirestopographicsurvey,geologicalsketching,sectionandresistancelineretesting,etc.Thebillingiscalculatedwithin10%ofthedirectcostoftheblastingproject.  2Blastingsafetyassessmentfee. Theblastingprojectapprovalunitentruststheunitorpersonnelwiththecorrespondingqualificationleveltocarryoutthesafetyassessmentoftheblastingproject. Thefeecollectionprincipleisbasedonthecostthatcansupporttheevaluation.Thechargingstandardisbasedonthedirectcostoftheblastingproject.Theevaluationfeeofdirectcostlessthan100,000yuaniscalculatedat5%;the10,000-100millionyuanis5%.3%ofthecalculation;100to5millionyuanto3%. 1%oftheproject,theprojectofmorethan5millionyuan,accordingtothenatureoftheproject,thedifficultyrate,therateisnotmorethan1%. ThedifficultyfactorfortheincreaseofthefeefortheClassAblastingprojectspecifiedintheblastingsafetyregulationsis1.1.  3Specialsupervisionfeeforblastingproject. Theprojectsupervisionshallbecarriedoutbytheblastingsupervisionunitwiththecorrespondinglevelofqualification. Theprojectconstructionunitemploysandsignstheprojectsupervisioncontract. Thebillingstandardiscalculatedbasedonthedirectcostoftheblastingproject.Theprojectwithin100,000yuaniscalculatedtobemorethan10%,theprojectwith10to1millionyuaniscalculatedfrom10%to5%,andtheprojectwith100to5millionyuaniscalculatedas5to5%.3%;projectswithaninvestmentofmorethan5millionyuanarecalculatedtobelessthan3%. ThedifficultyfactorfortheincreaseofthefeefortheClassAblastingprojectspecifiedintheblastingsafetyregulationsis1.1.

  • Categories:case study
  • Author:
  • Origin:
  • Time of issue:2019-05-05 15:57
  • Views:8
Information

Description

  Excerpted from the "New Blasting Project Consumption Quota" edited by China Engineering Blasting Association GYD-102-2008 Blasting engineering belongs to special technical engineering, in addition to the implementation of the "Building and Installation Engineering Cost Project Components" issued by the Ministry of Construction (Ministry of Construction, No. 206, 2003) In addition to the measures specified in the document, the projects that should be included in the measures are: blasting engineering design, safety assessment, supervision and monitoring.

  The blasting safety protection measures are as follows:

 

category

project name

Specific requirements

Blasting test

Blasting vibration, shock wave, noise and other testing items

Special testing equipment and analysis software for blasting vibration, pressure or noise, the instrument has calibration certificate and calibration certificate.

Shock absorption measures

Damping groove

Can be excavated at the edge of the source or protection object, should have a certain depth

Shock absorbing hole

Can be placed at the edge of the source, the depth of the damping hole is not less than the depth of the blasthole

Pre-crack

Can be placed at the edge of the source, the pre-crack depth is not less than the blasthole depth

Seismic reinforcement and cushioning measures necessary for protection

Temporary or permanent reinforcement

Shock wave protection

Blocking wall

Brick walls, stone walls, etc. can be used, and the wall should have a certain height and strength to prevent damage from bad weather. Underwater bubble curtain.

Block curtain

Can be made of rubber, wood, iron and other materials

Reduce blasting noise

Exposed blasting equipment cover

Covering materials include: sandbags, wood boards, iron plates, etc.

Dust protection

cover

Covering materials include: water bags, etc.

Occlusion

Close the protective object, set the water fog screen to block

watering

Setting a spray water system near the source

Hazardous gas protection

prediction

Experimental analysis of harmful gas content in explosives explosion

monitor

With special testing equipment and analysis software, the instrument has a calibration certificate.

Rolling stone protection

Retaining wall

Sandbag retaining wall, masonry retaining wall, etc.

Shelf

Steel pipe racks, wooden racks, bamboo racks, etc.

Hanging net

Materials include: nylon mesh, wire mesh, bamboo raft, small plate, iron plate, etc.

Cut stone ditch

It can be set at different positions from the source to the protection object. The stone channel should have a certain depth and width.

Rolling stone area reinforcement

Spray anchor reinforcement or other reinforcement measures

  Billing method: According to the approved construction plan and protective means, refer to the methods generally used and the materials used in the project site, and calculate according to the actual situation.

  Test blasting engineering

  According to the test plan and the scale of the test blasting project, the design and construction costs will be calculated separately.

  Other measures for blasting engineering

  According to the particularity of the blasting project, the following blasting measures should also be included in the preparation of the total cost of the blasting project:

  1 Blasting engineering design and assessment fee. The blasting design shall be undertaken by the unit with design qualification. The general open blasting shall be charged according to the direct cost of the blasting project of 3% to 5%; the design of the demolition blasting shall be detailed for the building structure, the materials used, the surrounding environment and the facilities that must be protected. In the investigation, the billing is calculated within 10% of the direct cost of the blasting project, and the Class A project is multiplied by a factor of 1.1 according to the level specified in the blasting safety regulations. The design of chamber blasting requires topographic survey, geological sketching, section and resistance line retesting, etc. The billing is calculated within 10% of the direct cost of the blasting project.

  2 Blasting safety assessment fee. The blasting project approval unit entrusts the unit or personnel with the corresponding qualification level to carry out the safety assessment of the blasting project. The fee collection principle is based on the cost that can support the evaluation. The charging standard is based on the direct cost of the blasting project. The evaluation fee of direct cost less than 100,000 yuan is calculated at 5%; the 10,000-100 million yuan is 5%. 3% of the calculation; 100 to 5 million yuan to 3%. 1% of the project, the project of more than 5 million yuan, according to the nature of the project, the difficulty rate, the rate is not more than 1%. The difficulty factor for the increase of the fee for the Class A blasting project specified in the blasting safety regulations is 1.1.

  3 Special supervision fee for blasting project. The project supervision shall be carried out by the blasting supervision unit with the corresponding level of qualification. The project construction unit employs and signs the project supervision contract. The billing standard is calculated based on the direct cost of the blasting project. The project within 100,000 yuan is calculated to be more than 10%, the project with 10 to 1 million yuan is calculated from 10% to 5%, and the project with 100 to 5 million yuan is calculated as 5 to 5%. 3%; projects with an investment of more than 5 million yuan are calculated to be less than 3%. The difficulty factor for the increase of the fee for the Class A blasting project specified in the blasting safety regulations is 1.1.

Scan the QR code to read on your phone

Safety Technology

please try again.
The fourth blasting vibration measurement technology seminar was held
BlastingVibrationTestingTechnologySeminar  BlastingVibrationTestingTechnologySeminar   OnApril15-17,2011,ChinaEngineeringBlastingAssociationhelda“BlastingVibrationTechnologySeminar”atButterflyValleyHotelinNanhai,GuangdongProvince.TheconferencewashostedbyChinaEngineeringBlastingAssociation,GuangzhouZhongboSafetyNetTechnologyCo.,Ltd.,YangtzeRiverWaterConservancyThecommitteewasco-organizedbytheYangtzeRiverScientificResearchInstituteandSouthChinaUniversityofTechnology,andGaoYintong,secretarygeneraloftheassociation,presidedoverthemeeting.  ChairmanWangXuguangattendedthemeetingtomakeanimportantspeech   ChairmanWangXuguangattendedthemeetingandmadeanimportantspeech. AcademicianWangpointedout:Atthebeginningofthe12thFive-YearPlan,thesituationinallwalksoflifeisverygood.Thisisagoodpromotionforthedevelopmentofourengineeringblastingindustry,anditalsomakesusfeelacertainpressure. Blastingvibrationmonitoringisamajoreventinourengineeringblastingindustry.ThesafetyaccidentsthattheChinaEngineeringBlastingAssociationhasbeeninvolvedininrecentyearsareallrelatedtotheimpactofblastingvibration.Therefore,theblastingvibrationpropagationlawshouldbewellrecorded,andadatabaseshouldbeestablished.Class,summary,refiningandprocessingcaneffectivelypromotetheresearchofblastingtheoryandpromotethebetterdevelopmentofengineeringblastingindustry.   AcademicianWangreviewedandsummarizedtheresearchworkonvibrationmeasurementintheindustrysincetheChinaEngineeringBlastingAssociation's"StudyontheImpactofBlastingVibrationandTestingTechnology"heldinHangzhouonApril10,2009.WangAcademicianpointedoutthattheChinaAssociationofExplosivesfrom2009SinceAprilofthisyear,threesymposiumsonblastingvibrationtestinghavebeenheld.Thismeetingisthefourthspecialmeeting.Afterthemeeting,thedevelopmentdirectionofindustrialblastingtestingtechnologyandvibrationtestinginstrumentsshouldbeclarifiedandshouldbeimplemented.Apersonisresponsibleforimplementation.   WuXinxia,​​QuGuangjian,GaoYing,HuangYuewen,LongYuan,YangNianhua,GaoWenxue,ChenQiliangandotherexpertsmadespecialspeeches,GuangzhouZhongboSafetyNetTechnologyCo.,Ltd.,SouthChinaUniversityofTechnologyandYangtzeRiverWaterResourcesCommissionChangjiangAcademyofSciencesandotherunitsontheblastingVibrationremotetesting,calibrationandsystemmanagementweredemonstratedanddemonstratedonsite.  ProfessorWuXinxiafromtheYangtzeRiverScientificResearchInstituteoftheYangtzeRiverWaterResourcesCommission  ProfessorQuGuangjianfromGuangzhouZhongboSafetyNetTechnologyCo.,Ltd.  AssociateProfessorGaoYingfromSouthChinaUniversityofTechnology  SeniorEngineerHuangYangwenfromtheYangtzeRiverScientificResearchInstituteoftheYangtzeRiverWaterResourcesCommittee  ProfessorLongYuanfromthePLAUniversityofScienceandTechnology  ResearcherYangNianhuafromChinaAcademyofRailwaySciences  ProfessorofHighLiterature,BeijingUniversityofTechnology  AssociateProfessorChenQiliangfromGuangzhouZhongboSafetyNetTechnologyCo.,Ltd.   ProfessorWuXinxiafromtheYangtzeRiverScientificResearchInstituteoftheYangtzeRiverWaterResourcesCommitteeintroducedtheconstructionconceptandmanagementmodeofthe"DangerDetectionRemoteSensingInformationManagementSystemforEngineeringBlasting"basedontheInternetofThingstechnology,andthecorrespondingblastingremoteintelligentrecorderandblastingvibrationremotecalibrationequipment;GuangzhouZhongboProfessorQuGuangjianofSafetyNetTechnologyCo.,Ltd.introducedtheimportanceofbuildingavibrationmeasurementinformationmanagementsystemandthecomposition,functionandobjectivesofthevibrationmeasurementinformationmanagementsystem,aswellasremotecalibrationtechnology,dataprocessingandmethods;AssociateProfessorGaoYingofSouthChinaUniversityofTechnologyThekeytechnologyofremotecalibrationandvibrationmeasurementplatformbasedonvibrationgridisalsodemonstrated.TheseniorengineerofYangtzeRiverWaterResourcesCommitteeYangYuewenintroducedthecomposition,performanceandremotecalibrationmethodofblastingdatamonitoringsystembasedonInternetofThings.TheproblemwasdiscussedbyProf.LongYuanfromPLAUniversityofScienceandTechnology.Theresearchonthestandardizationofengineeringblastingvibrationtestingtechnologywasintroduced.ResearcherYangNianhuaofChinaRailwayScienceResearchInstituteintroducedthetechnologyoffieldtestingofblastingvibration;ProfessorGaoWenofBeijingUniversityofTechnologyintroducedshallowtunnel Excavationblastingvibrationremotemonitoringsystemandtestingtechnology;AssociateProfessorChenQiliangofGuangzhouZhongboSafetyNetTechnologyCo.,Ltd.takesthewesternpipelineblastingvibrationmonitoringpracticeasanexampletointroducethestepsandcontentsofblastingvibrationmonitoringwork,anddiscussestheblastingvibrationmonitoringtechnologyinthenearApplicationproblemsinpipelineblastingengineering.   Afteraheateddiscussion,theparticipatingexpertsaffirmedthattheapplicationofinformationnetworktechnologyinthefieldofengineeringblastingisthefuturedevelopmenttrend,andputforwardthepreparationofthe"TechnicalTeachingMaterialsforEngineeringBlastingVibrationMeasurementTechnology"and"TechnicalSpecificationsforEngineeringBlastingVibrationInspection(S
Associate Professor Chen Qiliang from Guangzhou Zhongbo Safety Net Technology Co., Ltd.   Professor Wu Xinxia from the Yangtze River Scientific Research Institute of the Yangtze River Water Resources Committee introduced
Announcement:TheMinistryofPublicSecurityissuedtwostandardsforgradingmanagementofblastingoperations   AccordingtotheRegulationsontheSafetyManagementofCivilExplosives,theMinistryofPublicSecurityissuedtwostandardsforthegradingmanagementofblastingoperationsonMay2,2012-"QualificationRequirementsandManagementRequirementsforBlastingOperationUnits"(GA990-2012),Theblastingoperationprojectmanagementrequirements(GA991-2012)(hereinafterreferredtoas"twostandards"),andissuedthe"Noticeontheimplementationoftheblastingoperationunitqualificationconditionsandmanagementrequirements"and"blastingoperationprojectmanagementrequirements"》.   Recently,theMinistryofPublicSecuritywillorganizeandcarryoutnationalpublicityactivities. TheProvincialDepartmentwill,inaccordancewiththespiritoftheMinistryofPublicSecurity'snoticeandtherequirementsofpublicity,combinedwiththepracticeofpublicsecuritymanagementintheblastingoperationindustryofourprovince,carefullystudyandformulatetheimplementationofworksteps,conductresearch,developaworksystem,establishaspecialorganization,andcarryoutimplementationworkinanorderlymanner. Thespecificworkrequirementsaretobenotifiedbytheprovincialgovernment.   AccordingtothenoticeoftheMinistryofPublicSecurity,theworkofcleaningupandrectifyingtheexistingblastingoperationsunitsandissuingthe"BlastingOperationUnitPermit"shallbecompletedbyDecember31,2012. Therefore,asofJanuary1,2013,anyunitmustholdtheBlastingOperationUnitPermittoengageinblastingoperations,otherwiselegalliabilityshouldbepursued. Beforethatdate,theoriginallegal"ExplosivesUsePermit"cancontinuetobeusedbyunitsthathavenotbeenorderedtostoptheiremployment.Thecommercialblastingoperationunitcanstillholdaneffectiveconstructiondepartment"blastinganddemolition"qualification.Thedocumentsareintheprovincetoundertaketheblastingoperationitemsofthecorrespondingtype.   Fromnowon,theprovincewillnolongerapprovetheoriginal"ExplosiveGoodsUsePermit",andthepublicsecurityorganswillstopacceptingtheconditionalreviewworkoftheconstructionandconstructiondepartmententrustedbytheconstructiondepartmentto"blastinganddemolitioncontractingqualifications".   downloadattachment:   1.Noticeontheimplementationofthe"QualificationConditionsandManagementRequirementsforBlastingOperationUnits"and"ManagementRequirementsforBlastingOperationProjects"   2.Qualificationconditionsandmanagementrequirementsoftheblastingoperationunit   3.Blastingoperationprojectmanagementrequirements
Special Report on Demolition Blasting of 104 Meters High Building in Zhongshan City, Guangdong Province
Editor'snote:   ThePeakGardenwasbuiltin1994andwascappedin1997.The34-storeybuildingis344.1metershigh.Itisaframe-supportedshearwallstructure.Itisthetallestbuildingdemolishedbydomesticblastingandhasappliedtobecomethe"Asia'sfirstexplosion".Oneofthefewhigh-risebuildings. ThePeakGardenwasappliedforblastinginFebruarytoofficialblastingonAugust13.Thetimewasupto6months.Thedayswearelookingforwardtoarefinallycoming,andIwishtheChinesepeopleasuccessfulblast!   Joyaftersuccessfulblasting    Figure1   FigureII   Successfulblastingofthetopgarden    PreparetoblastChenShaopantoprovidepictures    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess   ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess  ChenShaopanprovidespicturesoftheblastingprocess   ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess   ChenShaopanprovidespicturesoftheblastingprocess   "Asia'sfirst-explosion"trackingreport-   Unfinished15yearsofplanning   "Asia'sfirstexplosion"     ——Theblastingofthe104.1mhighbuildingofShijiePeakGardeninZhongshan,Guangdong   "Five,four,three,two,one,detonation!"   At10:30onthemorningofAugust13,withtheorderofLiuWen,thechairmanofthesmashingengineeringheadquartersofShijiePeakGarden,thestaffofGuangdongZhongrenGroupConstructionCo.,Ltd.Pressedthepulsedetonatorinyourhand. "嘣,嘣,嘣..."18consecutiveloudnoises,afterashort3.6seconds,atotalheightof104.1meters,atotalof34layersofZhongshanShijiePeakGardenunfinishedbuildingsweighingtensofthousandsoftonsofbody,oneSuddenly,hesuddenly"squats"andsuddenlyrushestowardthewestsideoftheopenspace. Thethreehigh-poweredfireenginesthathavebeenwaitingforalongtimeimmediatelysprayedahugeamountofwatermist,andcarriedout“interceptioninterception”onthedust“whitesmoke”causedbytheexplosion,andsprinkledwatertoreducedust. Congratulationsontheheadquartersofthemeetingroomonthe4thfloorofShunjingGarden,andthesimpleviewingplatformsetuponthebalconyburstintoapplause. Atthispoint,theblastingprojectofthePeakGarden,whichisknownasthe"Asia'sNo.1Blast",wasacompletesuccess. Afterthat,itwillenterthedemolitionandclean-upphaseforupto50days.   ItisunderstoodthatthetopofthehillgardenislocatedinthesouthsideofZhongshanCollege,DongchengDistrict,ZhongshanCity,ZhongshanCity,ontheeastsideofthesnowroad,willbebuiltintheStarCityBuilding. Thebuildingtobeexplodedis104.1meters,withatotalof34floors(including1basement),33.8meterswidefromeasttowest,38.5meterslongfromnorthtosouth,and27875squaremeters. Thebuildingisframe-supportedshearwallstructure,arrangedina“well”shape.The1stfloorandthebasementareframestructures,the2-32floorsareshearwallstructures,andthemiddlepartisthecoretube. Theeastsideofthebuildingis44metersawayfromthebottomoftheslope,thesoutheastsideis40metersawayfromDongyueTemple;thesouthsideis5.2metersawayfromthewall,only6metersawayfromthenearestresidentialhouse;thewestsideis81metersawayfromthebottomoftheslope. Thebuildingwasbuiltin1994andwascappedin1997. Forvariousreasons,thebuildinghasnotbeenofficiallyputintouse.IthasbeenrenamedasthePeakGarden,YangmingMountainVilla,StarCity,andZhongshanCity,butithasneverbeenabletogetridofthefateofthe"unfinished". InJune2007,thebuildingwastransferredtoZhongshanChangjiangZhaoyeRealEstateDevelopmentCo.,Ltd.asawhole. InordertocopewiththeoverallplanningdevelopmentofZhongshanCity,acceleratethepaceofrenovationoftheoldcity,andaccordingtothecompany'sprojectplanningneeds,decidedtouseblastingdemolition,theplotwillberebuiltafterthedemolition.   OnFebruary25,commissionedbythePublicSecurityBureauoftheMinistryofPublicSecurity,theGuangdongProvincialPublicSecurityDepartmentandtheZhongshanPublicSecurityBureau,theChinaEngineeringBlastingAssociationhostedareviewmeetinginBeijingonthe“BlastingDemolitionProjectoftheUnfinishedBuildingoftheShijiazhuangPeakGardeninZhongshanCity”.TheexpertgroupledbyWangXuguang,academicianoftheChineseAcademyofEngineeringandchairmanoftheChinaEngineeringBlastingAssociation,listenedtothebriefingandreviewrequirementsoftheProvincialPublicSecurityDepartmentandtheMunicipalPublicSecurityBureauontheblastingproject,andintroducedtheconstructionplanoftheGuangdongZhongrenGroup.Afterquestioninganddiscussion,thereviewopinionswereputforwardandtheMunicipalPublicSecurityBureauwasapprovedtoapprovetheconstructionoftheproject. Inordertoensurethesafetyandsuccessoftheblastingdemolitionproject,theZhongshanMunicipalGovernmenthasspeciallysetupacoordinationheadquarters,whichisresponsiblefort
Call for papers on participation in the "6th International Conference on Explosives and Blasting Technology of China, Japan and Korea"
Allrelevantunits:   The6thInternationalConferenceonExplosivesandBlastingTechnologyofChina,JapanandKoreawasscheduledtobeheldinSouthKoreafromOctober12to16,2011.Theconferenceincludedexplosives,detonationequipment,geotechnicalblasting,mineblastinganddemolitionblasting. Inordertostrengtheninternationalacademicexchangesandtechnicalcooperation,theChinaEngineeringBlastingAssociationisnowissuingnoticesofessaystorelevantunitsanddepartments.Expertsfromenterprises,institutions,researchinstitutesanduniversitiesarewelcometosignupandactivelycontributetotheconference.   Theessaycontentisasfollows:   1.Callforpapers:   TheauthorisaskedtofirstsubmitanEnglishabstractofabout200to400words(includingthetitleofthearticle,author,unit,contactnumberande-mail)andkeywords. Thebestchoiceis3to5keywords.   Second,thedraftschedule:   (1)DeadlineforsubmissionofEnglishabstracts:July20,2011   (2)DeadlineforsubmissionoffulltextinEnglish:September10,2011   Third,themodeofsubmission:   PleasesendtheEnglishabstracttotheemailaddress:cseb@cseb.org.cnormingxiuzhu@yahoo.com.cn   Contact:ZhuMingxiu   Contactnumber:(010)88399565   Fax:(010)68344564   Contactaddress:No.1WenxingStreet,Xizhimen,Beijing100044
Seven years of honing the "Blasting Net" sharp display
Time of issue : 2019-05-30 10:01:00
TheCoalIndustryPublishingHousepublishedthenewbook"ThePracticalManualforCoalMineBlasting"publishedinApril2008,andintroducedthedetailsof"ZhongboNet"intheentiresectionofChapter23ofChapter23,fullyaffirmingitssafetytothecoalmineblastingindustry.Informationproductionplaysanimportantrole.   ItisenoughtoprovethatundertheleadershipoftheChinaEngineeringBlastingAssociationandthestrongsupportoftheblastingassociationsofvariousprovincesandcities,aftersevenyearsoftempering,intheeraofrapiddevelopmentofinformationtechnology,"ChinaBlastNetwork"hasbecomeChinawithoutanydispute.Theforerunnerofthedevelopmentofinformationizationintheengineeringblastingindustryhasbecomethelinkoftheinformationtransmissionoftheblastingindustryandthecivilexplosiveequipmentindustryandtheinformationcenterfortheacquisitionofrelevantinformation.   "ChinaBlastNetwork"hasbeenrecognizedbytheindustryasthefirstportalsiteoftheblastingindustry. Theloudandmeaningfulnameof"BlastingNet"isonceagainrevealed!   ChinaBlastingNetworkEditorialDepartment   April10,2009

Copyright@ 2002-2018 gzbpw Inc. All Rights Reserved Guizhou blasting network Copyright
Reproduction, abstraction, reproduction or mirror-building are prohibited without authorization.

Website Construction:Motivation of Chinese Enterprises   Guiyang    黔ICP备19013341号-2