Safety precautions engineering procedures and requirements

Safety precautions engineering procedures and requirements

(Summary description)People'sRepublicofChinaPublicSafetyIndustryStandard  SafetyEngineeringProceduresandRequirementsGA/T75-94  (MinistryofPublicSecurityissuedonMarch11,1994,implementedonJuly1,1997)  Subjectcontentandscopeofapplication   Thisstandardspecifiesthegeneralrequirementsforsafetyprotectionprojectestablishment,bidding,entrustment,design,approval,installation,commissioningandacceptance.   Programandmanagementrequirements.   Thisstandardappliestoallsafetyprecautions.   2terms   2.1Constructionunit   Theentrustingunitofthesafetyprecautionproject.   2.2Designunit   Aunitthatundertakessafetyprotectionengineeringdesigntasks.   2.3Constructionunit   Undertakesafetyprecautionsengineeringequipmentinstallation,commissioningandopening,engineeringequipmentmaintenanceservice   Unitofaffairs.   2.4SecurityEngineering   Alarm,TVmonitoring,communication,entranceandexitcontrol,explosionprotection,safetyinspection,etc.forthepurposeofmaintainingsocialpublicsafetyandpreventingdisasters.   2.5Projectscale   Theprojectscaleisdividedaccordingtotherisklevelortheinvestmentamountoftheproject,andisdividedintothreelevels.   2.5.1Primaryengineering   Projectwithaprimaryriskorinvestmentofmorethan1millionyuan   2.5.2SecondaryEngineering   Thesecond-levelriskorinvestmentexceeds300,000yuanandtheprojectislessthan1millionyuan.   2.5.3Three-levelengineering   Athree-levelriskorinvestmentprojectwithaninvestmentoflessthan300,000yuan.   3projectestablishment   3.1First-levelprojectproject   3.1.1Beforeapplyingfortheproject,thefeasibilitystudymustbecarriedoutandpreparedbytheconstructionunitordesignunit.   3.1.2Maincontentsofthefeasibilitystudyreport:   a.sourceoftasks;   b.Relevantregulationsandrequirementsofgovernmentdepartments;   c.Therisklevelandprotectionleveloftheprotectedtarget;   d.Thecontentandpurposerequirementsoftheproject;   e.Constructionperiod;   f.Projectcostestimate;   g.Analysisofsocialbenefits.   3.2Secondandthirdlevelprojectapproval   3.2.1Beforethesecondandthirdlevelsafetyprecautionsarecompleted,theremustbeadesigntaskbook.   Itispreparedbytheconstructionunititself,oritcanberequestedbythedesignunit.   3.2.2Contentsofthedesigntaskbook:   a.sourceoftasks;   b.Relevantregulationsandmanagementrequirementsofgovernmentdepartments;   c.Thecontentandpurposerequirementsoftheproject;   d.Constructionperiod;   e.Theamountofprojectinvestmentcontrol;   f.Theexpectedeffectthatshouldbeachievedaftercompletion.   3.3Approvaloffeasibilitystudyreportanddesigntaskbook   Afterthefeasibilitystudyreportandthedesigntaskbookareapprovedbythecorrespondingcompetentauthorities,theprojectisformallyestablished.   4Qualificationexaminationandprojectbidding,commission   4.1Qualificationreview   Theunitundertakingsafetydesignandconstructionshallholdthequalificationcertificateforengineeringdesignandconstructionapprovedbythepublicsecuritytechnicaldefensemanagementdepartmentatorabovetheprovinciallevel,andshallbeverifiedbythepublicsecuritytechnicalprotectionmanagementdepartmentoftheconstructionunit.Undertakeengineeringdesignandconstruction.   4.2ProjectBiddingandEntrustment   4.2.1Projectbidding   a.Theconstructionunitshallpreparethebiddingdocumentsandissuethebiddingadvertisementsornoticesaccordingtotherequirementsofthetaskbook;   b.Theconstructionunitorganizesthebiddingunittosurveytheworksiteandanswerrelevantquestionsinthebiddingdocuments;   c.Thebiddingunitsealsandsubmitsthetender;   d.Publicbidopening,negotiation,reviewofbids,determinationofthewinningbidder,issueofthebidwinningnotice;   e.Thebiddingunitsignsthecontractwiththewinningbidder.   4.2.2Projectcommission   Theconstructionunitshallsubmittheentrustmenttotheengineeringdesign(construction)unitaccordingtotherequirementsofthedesigntaskbook.Theengineeringdesign(construction)unitshallsubmittheprojectproposalorprojectimplementationplanaccordingtotherequirementsofthepowerofattorneyandthedesigntaskbook.Aftertheconstructionunithasexaminedandapproved,Thecontractcanbesignedwhenthecommissioniseffective.   5contract   5.1ContractContent   a.projectnameandcontent;   b.Responsibilitiesandobligationsoftheconstructionunitandthedesign(construction)unit;   c.Projectschedulerequirements;   d.Projectcostsandpaymentmethods;   e.Projectacceptancemethod;   f.Personneltrainingandmaintenance;   g.Riskandliabilityforbreachofcontract;   h.Otherrelatedmatters.   5.2ContractAttachment   a.winningthebidorpowerofattorney;   b.Designtaskbook;   c.Otherdocumentsidentifiedbybothparties.   6engineeringdesign   6.1Preliminarydesignandprogramdemonstration   Theprimaryandsecondaryprojectsmustcarryoutpreliminarydesignandprogramdemonstration. Thepreliminarydesignshallbecarriedoutafterthecommissionoftheprojecttakeseffect.   6.1.1Thepreliminarydesignshallhavethefollowingcontents:   a.Systemdesignplanandsystemfunction;   b.Equipmentplanelayoutandprotectionrange;   c.Systemblockdiagramandlistofmajorequipmentpackages;   d.Centercontrolroomlayoutandoperation;   e.Pipelinelayingplan;   f.Projectcostestimateandconstructionperiod.   6.1.2SchemeArgumentation   6.1.2.1

Safety precautions engineering procedures and requirements

(Summary description)People'sRepublicofChinaPublicSafetyIndustryStandard  SafetyEngineeringProceduresandRequirementsGA/T75-94  (MinistryofPublicSecurityissuedonMarch11,1994,implementedonJuly1,1997)  Subjectcontentandscopeofapplication   Thisstandardspecifiesthegeneralrequirementsforsafetyprotectionprojectestablishment,bidding,entrustment,design,approval,installation,commissioningandacceptance.   Programandmanagementrequirements.   Thisstandardappliestoallsafetyprecautions.   2terms   2.1Constructionunit   Theentrustingunitofthesafetyprecautionproject.   2.2Designunit   Aunitthatundertakessafetyprotectionengineeringdesigntasks.   2.3Constructionunit   Undertakesafetyprecautionsengineeringequipmentinstallation,commissioningandopening,engineeringequipmentmaintenanceservice   Unitofaffairs.   2.4SecurityEngineering   Alarm,TVmonitoring,communication,entranceandexitcontrol,explosionprotection,safetyinspection,etc.forthepurposeofmaintainingsocialpublicsafetyandpreventingdisasters.   2.5Projectscale   Theprojectscaleisdividedaccordingtotherisklevelortheinvestmentamountoftheproject,andisdividedintothreelevels.   2.5.1Primaryengineering   Projectwithaprimaryriskorinvestmentofmorethan1millionyuan   2.5.2SecondaryEngineering   Thesecond-levelriskorinvestmentexceeds300,000yuanandtheprojectislessthan1millionyuan.   2.5.3Three-levelengineering   Athree-levelriskorinvestmentprojectwithaninvestmentoflessthan300,000yuan.   3projectestablishment   3.1First-levelprojectproject   3.1.1Beforeapplyingfortheproject,thefeasibilitystudymustbecarriedoutandpreparedbytheconstructionunitordesignunit.   3.1.2Maincontentsofthefeasibilitystudyreport:   a.sourceoftasks;   b.Relevantregulationsandrequirementsofgovernmentdepartments;   c.Therisklevelandprotectionleveloftheprotectedtarget;   d.Thecontentandpurposerequirementsoftheproject;   e.Constructionperiod;   f.Projectcostestimate;   g.Analysisofsocialbenefits.   3.2Secondandthirdlevelprojectapproval   3.2.1Beforethesecondandthirdlevelsafetyprecautionsarecompleted,theremustbeadesigntaskbook.   Itispreparedbytheconstructionunititself,oritcanberequestedbythedesignunit.   3.2.2Contentsofthedesigntaskbook:   a.sourceoftasks;   b.Relevantregulationsandmanagementrequirementsofgovernmentdepartments;   c.Thecontentandpurposerequirementsoftheproject;   d.Constructionperiod;   e.Theamountofprojectinvestmentcontrol;   f.Theexpectedeffectthatshouldbeachievedaftercompletion.   3.3Approvaloffeasibilitystudyreportanddesigntaskbook   Afterthefeasibilitystudyreportandthedesigntaskbookareapprovedbythecorrespondingcompetentauthorities,theprojectisformallyestablished.   4Qualificationexaminationandprojectbidding,commission   4.1Qualificationreview   Theunitundertakingsafetydesignandconstructionshallholdthequalificationcertificateforengineeringdesignandconstructionapprovedbythepublicsecuritytechnicaldefensemanagementdepartmentatorabovetheprovinciallevel,andshallbeverifiedbythepublicsecuritytechnicalprotectionmanagementdepartmentoftheconstructionunit.Undertakeengineeringdesignandconstruction.   4.2ProjectBiddingandEntrustment   4.2.1Projectbidding   a.Theconstructionunitshallpreparethebiddingdocumentsandissuethebiddingadvertisementsornoticesaccordingtotherequirementsofthetaskbook;   b.Theconstructionunitorganizesthebiddingunittosurveytheworksiteandanswerrelevantquestionsinthebiddingdocuments;   c.Thebiddingunitsealsandsubmitsthetender;   d.Publicbidopening,negotiation,reviewofbids,determinationofthewinningbidder,issueofthebidwinningnotice;   e.Thebiddingunitsignsthecontractwiththewinningbidder.   4.2.2Projectcommission   Theconstructionunitshallsubmittheentrustmenttotheengineeringdesign(construction)unitaccordingtotherequirementsofthedesigntaskbook.Theengineeringdesign(construction)unitshallsubmittheprojectproposalorprojectimplementationplanaccordingtotherequirementsofthepowerofattorneyandthedesigntaskbook.Aftertheconstructionunithasexaminedandapproved,Thecontractcanbesignedwhenthecommissioniseffective.   5contract   5.1ContractContent   a.projectnameandcontent;   b.Responsibilitiesandobligationsoftheconstructionunitandthedesign(construction)unit;   c.Projectschedulerequirements;   d.Projectcostsandpaymentmethods;   e.Projectacceptancemethod;   f.Personneltrainingandmaintenance;   g.Riskandliabilityforbreachofcontract;   h.Otherrelatedmatters.   5.2ContractAttachment   a.winningthebidorpowerofattorney;   b.Designtaskbook;   c.Otherdocumentsidentifiedbybothparties.   6engineeringdesign   6.1Preliminarydesignandprogramdemonstration   Theprimaryandsecondaryprojectsmustcarryoutpreliminarydesignandprogramdemonstration. Thepreliminarydesignshallbecarriedoutafterthecommissionoftheprojecttakeseffect.   6.1.1Thepreliminarydesignshallhavethefollowingcontents:   a.Systemdesignplanandsystemfunction;   b.Equipmentplanelayoutandprotectionrange;   c.Systemblockdiagramandlistofmajorequipmentpackages;   d.Centercontrolroomlayoutandoperation;   e.Pipelinelayingplan;   f.Projectcostestimateandconstructionperiod.   6.1.2SchemeArgumentation   6.1.2.1

Information

People's Republic of China Public Safety Industry Standard

  Safety Engineering Procedures and Requirements GA/T 75-94

  (Ministry of Public Security issued on March 11, 1994, implemented on July 1, 1997)

 

 Subject content and scope of application

 

  This standard specifies the general requirements for safety protection project establishment, bidding, entrustment, design, approval, installation, commissioning and acceptance.

 

  Program and management requirements.

 

  This standard applies to all safety precautions.

 

  2 terms

 

  2.1 Construction unit

 

  The entrusting unit of the safety precaution project.

 

  2.2 Design unit

 

  A unit that undertakes safety protection engineering design tasks.

 

  2.3 Construction unit

 

  Undertake safety precautions engineering equipment installation, commissioning and opening, engineering equipment maintenance service

 

  Unit of affairs.

 

  2.4 Security Engineering

 

  Alarm, TV monitoring, communication, entrance and exit control, explosion protection, safety inspection, etc. for the purpose of maintaining social public safety and preventing disasters.

 

  2.5 Project scale

 

  The project scale is divided according to the risk level or the investment amount of the project, and is divided into three levels.

 

  2.5.1 Primary engineering

 

  Project with a primary risk or investment of more than 1 million yuan

 

  2.5.2 Secondary Engineering

 

  The second-level risk or investment exceeds 300,000 yuan and the project is less than 1 million yuan.

 

  2.5.3 Three-level engineering

 

  A three-level risk or investment project with an investment of less than 300,000 yuan.

 

  3 project establishment

 

  3.1 First-level project project

 

  3.1.1 Before applying for the project, the feasibility study must be carried out and prepared by the construction unit or design unit.

 

  3.1.2 Main contents of the feasibility study report:

 

  a. source of tasks;

 

  b. Relevant regulations and requirements of government departments;

 

  c. The risk level and protection level of the protected target;

 

  d. The content and purpose requirements of the project;

 

  e. Construction period;

 

  f. Project cost estimate;

 

  g. Analysis of social benefits.

 

  3.2 Second and third level project approval

 

  3.2.1 Before the second and third level safety precautions are completed, there must be a design task book.

 

  It is prepared by the construction unit itself, or it can be requested by the design unit.

 

  3.2.2 Contents of the design task book:

 

  a. source of tasks;

 

  b. Relevant regulations and management requirements of government departments;

 

  c. The content and purpose requirements of the project;

 

  d. Construction period;

 

  e. The amount of project investment control;

 

  f. The expected effect that should be achieved after completion.

 

  3.3 Approval of feasibility study report and design task book

 

  After the feasibility study report and the design task book are approved by the corresponding competent authorities, the project is formally established.

 

  4 Qualification examination and project bidding, commission

 

  4.1 Qualification review

 

  The unit undertaking safety design and construction shall hold the qualification certificate for engineering design and construction approved by the public security technical defense management department at or above the provincial level, and shall be verified by the public security technical protection management department of the construction unit. Undertake engineering design and construction.

 

  4.2 Project Bidding and Entrustment

 

  4.2.1 Project bidding

 

  a. The construction unit shall prepare the bidding documents and issue the bidding advertisements or notices according to the requirements of the task book;

 

  b. The construction unit organizes the bidding unit to survey the work site and answer relevant questions in the bidding documents;

 

  c. The bidding unit seals and submits the tender;

 

  d. Public bid opening, negotiation, review of bids, determination of the winning bidder, issue of the bid winning notice;

 

  e. The bidding unit signs the contract with the winning bidder.

 

  4.2.2 Project commission

 

  The construction unit shall submit the entrustment to the engineering design (construction) unit according to the requirements of the design task book. The engineering design (construction) unit shall submit the project proposal or project implementation plan according to the requirements of the power of attorney and the design task book. After the construction unit has examined and approved, The contract can be signed when the commission is effective.

 

  5 contract

 

  5.1 Contract Content

 

  a. project name and content;

 

  b. Responsibilities and obligations of the construction unit and the design (construction) unit;

 

  c. Project schedule requirements;

 

  d. Project costs and payment methods;

 

  e. Project acceptance method;

 

  f. Personnel training and maintenance;

 

  g. Risk and liability for breach of contract;

 

  h. Other related matters.

 

  5.2 Contract Attachment

 

  a. winning the bid or power of attorney;

 

  b. Design task book;

 

  c. Other documents identified by both parties.

 

  6 engineering design

 

  6.1 Preliminary design and program demonstration

 

  The primary and secondary projects must carry out preliminary design and program demonstration. The preliminary design shall be carried out after the commission of the project takes effect.

 

  6.1.1 The preliminary design shall have the following contents:

 

  a. System design plan and system function;

 

  b. Equipment plane layout and protection range;

 

  c. System block diagram and list of major equipment packages;

 

  d. Center control room layout and operation;

 

  e. Pipeline laying plan;

 

  f. Project cost estimate and construction period.

 

  6.1.2 Scheme Argumentation

 

  6.1.2.1 After the preliminary design is completed, the project shall organize the project demonstration, which shall be presided over by the construction unit, and the competent department of business, the public security department and the design and construction unit and a certain number of technical experts shall participate.

 

  6.1.2.2 Review the contents of the preliminary design and evaluate its technology, quality, cost, duration, service and expected results. For evaluation opinions that have objections, the design unit and the construction unit must coordinate the handling of opinions before they can be submitted for approval.

 

  6.1.3 preliminary design approval

 

  The preliminary design and argumentation opinions of the project shall be submitted to the corresponding competent department for approval by the construction unit, and the formal design stage may be entered after approval.

 

  6.2 formal design

 

  6.2.1 Technical design

 

  The first and second grade projects shall be technically designed before the construction drawing design. Technical design must have the following:

 

  a. design task book;

 

  b. Design report;

 

  c. The working principle of the system;

 

  d. The product model, manufacturer, and main functions of the central control equipment;

 

  e. Product models, manufacturers, and main functions of various detectors, monitoring equipment and other front-end devices;

 

  f. List of equipment and equipment.

 

  6.2.2 Construction drawing design

 

  The construction drawings include the following:

 

  a. Detector arming plan, central equipment layout, system and sub-system connection diagram;

 

  b. pipeline requirements and pipeline layout drawings;

 

  c. Equipment, equipment installation requirements and installation drawings.

 

  6.2.3 Operation and maintenance instructions

 

  The operation and maintenance instructions shall include the following contents:

 

  a. system use, operation manual;

 

  b. system maintenance manual;

 

  c. Description of the computer program.

 

  6.3 Project Cost Budget

 

  a. Equipment equipment budget

 

  b. Design and construction cost budget;

 

  c. System maintenance and repair cost budget;

 

  d. Project inspection fee budget.

 

  6.4 Design documents and project cost budget review and approval

 

  Except for the special design documents that need to be examined and approved by the public security department, the construction unit will preside over the approval of the design documents and budget.

 

  7 project implementation

 

  a. After the technical design, construction drawing design and project cost budget review and approval in the formal design, the project can proceed with the construction phase; b. According to the equipment pre-selected in the engineering design document and its predetermined quantity;

 

  c. Pipeline installation facilities according to pipeline laying drawings and relevant construction specifications;

 

  d. Install equipment and equipment according to the technical requirements of the construction drawing;

 

  e. System debugging according to system function requirements.

 

  8 trial operation and training

 

  8.1 trial run

 

  After the system commissioning is opened, it shall be tested for at least one month, and the construction unit shall record the trial operation.

 

  8.2 Test run report

 

  The construction unit submits a trial operation report based on the records during the trial operation, including:

 

  a. Whether the system is running normally;

 

  b. Whether the system function meets the design requirements;

 

  c. Analysis of the number of false alarms, leak alarms and causes;

 

  d. The number of faults generated, the time to troubleshoot;

 

  e. Whether the repair service complies with the contract.

 

  8.3 Training

 

  Train the relevant personnel in accordance with the relevant terms of the contract. The training outline should be approved by the construction unit.

 

  9 completion and initial inspection

 

  9.1 Completion

 

  The project is completed according to the provisions of the design task book. After the trial operation meets the design requirements and is approved by the construction unit, it is deemed to be completed. A small number of non-main projects have not been completed in accordance with the contract. After consultation between the construction unit and the design and construction unit, there are clear treatment methods for the remaining problems. After the trial operation and approval by the construction unit, it can also be completed and written by the design and construction unit. Completion report.

 

  9.2 initial test

 

  The construction unit shall organize the design and construction unit to conduct the initial inspection according to the requirements of the design task book and write the initial inspection report.

 

  10 project acceptance

 

  10.1 System Testing

 

  Before the formal acceptance of the first and second grade projects, the inspection department must carry out systematic inspection and issue a test report.

 

  10.2 Acceptance documents

 

  The first and second level safety precautions must have the following documents, and the third level safety precautions can be simplified according to the specific situation.

 

  a. test run report;

 

  b. Completion report;

 

  c. initial report;

 

  d. System test report;

 

  e. Completion final report;

 

  f. Formally design the same set of documents and as-built drawings.

 

  10.3 Project Acceptance Committee

 

  The project acceptance committee (or group) shall be composed of the competent department of higher authorities of the construction unit, the competent department of public security, and the main person in charge of the construction unit and technical experts.

 

  The Engineering Acceptance Committee can form three acceptance groups:

 

  a. technical acceptance group;

 

  b. Construction acceptance group;

 

  c. Data review team.

 

  10.4 Review and acceptance

 

  Review and acceptance according to the relevant terms of the contract

 

  10.4.1 Technical acceptance

 

  Technical acceptance and acceptance of equipment and equipment acceptance and system acceptance:

 

  a. Equipment acceptance

 

  All equipment should have a quality certificate that meets national or industry standards.

 

  b. Technical system acceptance

 

  Based on the system test report, check the design task book and design file to check whether the system performance and quality meet the requirements.

 

  10.4.2 Construction Acceptance

 

  Construction acceptance is divided into two parts: equipment installation and pipeline laying.

 

  a. Equipment installation acceptance

 

  Based on the test report, check whether the installation quality and installation process meet the national standards and technical requirements related to the construction and installation specifications.

 

  b. Pipeline laying acceptance

 

  Based on the test report, check whether the construction process of the Ming-Pipe pipeline and the surface-mounted junction box, cable joints in the tube well, etc. meet the technical requirements in the installation specification.

 

  10.4.3 Data review

 

  Review according to the documents listed in 10.2 of this standard. The documents are required to be complete, the text is accurate, and the drawings are complete.

 

  10.5 Conclusion

 

  The project acceptance committee (group) summarizes the results of the review of 10.4.1, 10.4.2 and 10.4.3 to write the conclusion of the project acceptance.

 

  Additional information:

 

  This standard was proposed by the Ministry of Public Security of the People's Republic

 

  This standard is under the jurisdiction of the National Security and Alarm System Standardization Technical Committee.

 

  The Standards Department of the Ministry of Public Security and the First Institute of the Ministry of Public Security are responsible for drafting.

 

  The main drafters of this standard are Li Jingfang, Yang Zhipeng, and Tong Shi.

v

Scan the QR code to read on your phone

Safety Technology

please try again.
The fourth blasting vibration measurement technology seminar was held
BlastingVibrationTestingTechnologySeminar  BlastingVibrationTestingTechnologySeminar   OnApril15-17,2011,ChinaEngineeringBlastingAssociationhelda“BlastingVibrationTechnologySeminar”atButterflyValleyHotelinNanhai,GuangdongProvince.TheconferencewashostedbyChinaEngineeringBlastingAssociation,GuangzhouZhongboSafetyNetTechnologyCo.,Ltd.,YangtzeRiverWaterConservancyThecommitteewasco-organizedbytheYangtzeRiverScientificResearchInstituteandSouthChinaUniversityofTechnology,andGaoYintong,secretarygeneraloftheassociation,presidedoverthemeeting.  ChairmanWangXuguangattendedthemeetingtomakeanimportantspeech   ChairmanWangXuguangattendedthemeetingandmadeanimportantspeech. AcademicianWangpointedout:Atthebeginningofthe12thFive-YearPlan,thesituationinallwalksoflifeisverygood.Thisisagoodpromotionforthedevelopmentofourengineeringblastingindustry,anditalsomakesusfeelacertainpressure. Blastingvibrationmonitoringisamajoreventinourengineeringblastingindustry.ThesafetyaccidentsthattheChinaEngineeringBlastingAssociationhasbeeninvolvedininrecentyearsareallrelatedtotheimpactofblastingvibration.Therefore,theblastingvibrationpropagationlawshouldbewellrecorded,andadatabaseshouldbeestablished.Class,summary,refiningandprocessingcaneffectivelypromotetheresearchofblastingtheoryandpromotethebetterdevelopmentofengineeringblastingindustry.   AcademicianWangreviewedandsummarizedtheresearchworkonvibrationmeasurementintheindustrysincetheChinaEngineeringBlastingAssociation's"StudyontheImpactofBlastingVibrationandTestingTechnology"heldinHangzhouonApril10,2009.WangAcademicianpointedoutthattheChinaAssociationofExplosivesfrom2009SinceAprilofthisyear,threesymposiumsonblastingvibrationtestinghavebeenheld.Thismeetingisthefourthspecialmeeting.Afterthemeeting,thedevelopmentdirectionofindustrialblastingtestingtechnologyandvibrationtestinginstrumentsshouldbeclarifiedandshouldbeimplemented.Apersonisresponsibleforimplementation.   WuXinxia,​​QuGuangjian,GaoYing,HuangYuewen,LongYuan,YangNianhua,GaoWenxue,ChenQiliangandotherexpertsmadespecialspeeches,GuangzhouZhongboSafetyNetTechnologyCo.,Ltd.,SouthChinaUniversityofTechnologyandYangtzeRiverWaterResourcesCommissionChangjiangAcademyofSciencesandotherunitsontheblastingVibrationremotetesting,calibrationandsystemmanagementweredemonstratedanddemonstratedonsite.  ProfessorWuXinxiafromtheYangtzeRiverScientificResearchInstituteoftheYangtzeRiverWaterResourcesCommission  ProfessorQuGuangjianfromGuangzhouZhongboSafetyNetTechnologyCo.,Ltd.  AssociateProfessorGaoYingfromSouthChinaUniversityofTechnology  SeniorEngineerHuangYangwenfromtheYangtzeRiverScientificResearchInstituteoftheYangtzeRiverWaterResourcesCommittee  ProfessorLongYuanfromthePLAUniversityofScienceandTechnology  ResearcherYangNianhuafromChinaAcademyofRailwaySciences  ProfessorofHighLiterature,BeijingUniversityofTechnology  AssociateProfessorChenQiliangfromGuangzhouZhongboSafetyNetTechnologyCo.,Ltd.   ProfessorWuXinxiafromtheYangtzeRiverScientificResearchInstituteoftheYangtzeRiverWaterResourcesCommitteeintroducedtheconstructionconceptandmanagementmodeofthe"DangerDetectionRemoteSensingInformationManagementSystemforEngineeringBlasting"basedontheInternetofThingstechnology,andthecorrespondingblastingremoteintelligentrecorderandblastingvibrationremotecalibrationequipment;GuangzhouZhongboProfessorQuGuangjianofSafetyNetTechnologyCo.,Ltd.introducedtheimportanceofbuildingavibrationmeasurementinformationmanagementsystemandthecomposition,functionandobjectivesofthevibrationmeasurementinformationmanagementsystem,aswellasremotecalibrationtechnology,dataprocessingandmethods;AssociateProfessorGaoYingofSouthChinaUniversityofTechnologyThekeytechnologyofremotecalibrationandvibrationmeasurementplatformbasedonvibrationgridisalsodemonstrated.TheseniorengineerofYangtzeRiverWaterResourcesCommitteeYangYuewenintroducedthecomposition,performanceandremotecalibrationmethodofblastingdatamonitoringsystembasedonInternetofThings.TheproblemwasdiscussedbyProf.LongYuanfromPLAUniversityofScienceandTechnology.Theresearchonthestandardizationofengineeringblastingvibrationtestingtechnologywasintroduced.ResearcherYangNianhuaofChinaRailwayScienceResearchInstituteintroducedthetechnologyoffieldtestingofblastingvibration;ProfessorGaoWenofBeijingUniversityofTechnologyintroducedshallowtunnel Excavationblastingvibrationremotemonitoringsystemandtestingtechnology;AssociateProfessorChenQiliangofGuangzhouZhongboSafetyNetTechnologyCo.,Ltd.takesthewesternpipelineblastingvibrationmonitoringpracticeasanexampletointroducethestepsandcontentsofblastingvibrationmonitoringwork,anddiscussestheblastingvibrationmonitoringtechnologyinthenearApplicationproblemsinpipelineblastingengineering.   Afteraheateddiscussion,theparticipatingexpertsaffirmedthattheapplicationofinformationnetworktechnologyinthefieldofengineeringblastingisthefuturedevelopmenttrend,andputforwardthepreparationofthe"TechnicalTeachingMaterialsforEngineeringBlastingVibrationMeasurementTechnology"and"TechnicalSpecificationsforEngineeringBlastingVibrationInspection(S
Associate Professor Chen Qiliang from Guangzhou Zhongbo Safety Net Technology Co., Ltd.   Professor Wu Xinxia from the Yangtze River Scientific Research Institute of the Yangtze River Water Resources Committee introduced
Announcement:TheMinistryofPublicSecurityissuedtwostandardsforgradingmanagementofblastingoperations   AccordingtotheRegulationsontheSafetyManagementofCivilExplosives,theMinistryofPublicSecurityissuedtwostandardsforthegradingmanagementofblastingoperationsonMay2,2012-"QualificationRequirementsandManagementRequirementsforBlastingOperationUnits"(GA990-2012),Theblastingoperationprojectmanagementrequirements(GA991-2012)(hereinafterreferredtoas"twostandards"),andissuedthe"Noticeontheimplementationoftheblastingoperationunitqualificationconditionsandmanagementrequirements"and"blastingoperationprojectmanagementrequirements"》.   Recently,theMinistryofPublicSecuritywillorganizeandcarryoutnationalpublicityactivities. TheProvincialDepartmentwill,inaccordancewiththespiritoftheMinistryofPublicSecurity'snoticeandtherequirementsofpublicity,combinedwiththepracticeofpublicsecuritymanagementintheblastingoperationindustryofourprovince,carefullystudyandformulatetheimplementationofworksteps,conductresearch,developaworksystem,establishaspecialorganization,andcarryoutimplementationworkinanorderlymanner. Thespecificworkrequirementsaretobenotifiedbytheprovincialgovernment.   AccordingtothenoticeoftheMinistryofPublicSecurity,theworkofcleaningupandrectifyingtheexistingblastingoperationsunitsandissuingthe"BlastingOperationUnitPermit"shallbecompletedbyDecember31,2012. Therefore,asofJanuary1,2013,anyunitmustholdtheBlastingOperationUnitPermittoengageinblastingoperations,otherwiselegalliabilityshouldbepursued. Beforethatdate,theoriginallegal"ExplosivesUsePermit"cancontinuetobeusedbyunitsthathavenotbeenorderedtostoptheiremployment.Thecommercialblastingoperationunitcanstillholdaneffectiveconstructiondepartment"blastinganddemolition"qualification.Thedocumentsareintheprovincetoundertaketheblastingoperationitemsofthecorrespondingtype.   Fromnowon,theprovincewillnolongerapprovetheoriginal"ExplosiveGoodsUsePermit",andthepublicsecurityorganswillstopacceptingtheconditionalreviewworkoftheconstructionandconstructiondepartmententrustedbytheconstructiondepartmentto"blastinganddemolitioncontractingqualifications".   downloadattachment:   1.Noticeontheimplementationofthe"QualificationConditionsandManagementRequirementsforBlastingOperationUnits"and"ManagementRequirementsforBlastingOperationProjects"   2.Qualificationconditionsandmanagementrequirementsoftheblastingoperationunit   3.Blastingoperationprojectmanagementrequirements
Special Report on Demolition Blasting of 104 Meters High Building in Zhongshan City, Guangdong Province
Editor'snote:   ThePeakGardenwasbuiltin1994andwascappedin1997.The34-storeybuildingis344.1metershigh.Itisaframe-supportedshearwallstructure.Itisthetallestbuildingdemolishedbydomesticblastingandhasappliedtobecomethe"Asia'sfirstexplosion".Oneofthefewhigh-risebuildings. ThePeakGardenwasappliedforblastinginFebruarytoofficialblastingonAugust13.Thetimewasupto6months.Thedayswearelookingforwardtoarefinallycoming,andIwishtheChinesepeopleasuccessfulblast!   Joyaftersuccessfulblasting    Figure1   FigureII   Successfulblastingofthetopgarden    PreparetoblastChenShaopantoprovidepictures    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess   ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess  ChenShaopanprovidespicturesoftheblastingprocess   ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess    ChenShaopanprovidespicturesoftheblastingprocess   ChenShaopanprovidespicturesoftheblastingprocess   "Asia'sfirst-explosion"trackingreport-   Unfinished15yearsofplanning   "Asia'sfirstexplosion"     ——Theblastingofthe104.1mhighbuildingofShijiePeakGardeninZhongshan,Guangdong   "Five,four,three,two,one,detonation!"   At10:30onthemorningofAugust13,withtheorderofLiuWen,thechairmanofthesmashingengineeringheadquartersofShijiePeakGarden,thestaffofGuangdongZhongrenGroupConstructionCo.,Ltd.Pressedthepulsedetonatorinyourhand. "嘣,嘣,嘣..."18consecutiveloudnoises,afterashort3.6seconds,atotalheightof104.1meters,atotalof34layersofZhongshanShijiePeakGardenunfinishedbuildingsweighingtensofthousandsoftonsofbody,oneSuddenly,hesuddenly"squats"andsuddenlyrushestowardthewestsideoftheopenspace. Thethreehigh-poweredfireenginesthathavebeenwaitingforalongtimeimmediatelysprayedahugeamountofwatermist,andcarriedout“interceptioninterception”onthedust“whitesmoke”causedbytheexplosion,andsprinkledwatertoreducedust. Congratulationsontheheadquartersofthemeetingroomonthe4thfloorofShunjingGarden,andthesimpleviewingplatformsetuponthebalconyburstintoapplause. Atthispoint,theblastingprojectofthePeakGarden,whichisknownasthe"Asia'sNo.1Blast",wasacompletesuccess. Afterthat,itwillenterthedemolitionandclean-upphaseforupto50days.   ItisunderstoodthatthetopofthehillgardenislocatedinthesouthsideofZhongshanCollege,DongchengDistrict,ZhongshanCity,ZhongshanCity,ontheeastsideofthesnowroad,willbebuiltintheStarCityBuilding. Thebuildingtobeexplodedis104.1meters,withatotalof34floors(including1basement),33.8meterswidefromeasttowest,38.5meterslongfromnorthtosouth,and27875squaremeters. Thebuildingisframe-supportedshearwallstructure,arrangedina“well”shape.The1stfloorandthebasementareframestructures,the2-32floorsareshearwallstructures,andthemiddlepartisthecoretube. Theeastsideofthebuildingis44metersawayfromthebottomoftheslope,thesoutheastsideis40metersawayfromDongyueTemple;thesouthsideis5.2metersawayfromthewall,only6metersawayfromthenearestresidentialhouse;thewestsideis81metersawayfromthebottomoftheslope. Thebuildingwasbuiltin1994andwascappedin1997. Forvariousreasons,thebuildinghasnotbeenofficiallyputintouse.IthasbeenrenamedasthePeakGarden,YangmingMountainVilla,StarCity,andZhongshanCity,butithasneverbeenabletogetridofthefateofthe"unfinished". InJune2007,thebuildingwastransferredtoZhongshanChangjiangZhaoyeRealEstateDevelopmentCo.,Ltd.asawhole. InordertocopewiththeoverallplanningdevelopmentofZhongshanCity,acceleratethepaceofrenovationoftheoldcity,andaccordingtothecompany'sprojectplanningneeds,decidedtouseblastingdemolition,theplotwillberebuiltafterthedemolition.   OnFebruary25,commissionedbythePublicSecurityBureauoftheMinistryofPublicSecurity,theGuangdongProvincialPublicSecurityDepartmentandtheZhongshanPublicSecurityBureau,theChinaEngineeringBlastingAssociationhostedareviewmeetinginBeijingonthe“BlastingDemolitionProjectoftheUnfinishedBuildingoftheShijiazhuangPeakGardeninZhongshanCity”.TheexpertgroupledbyWangXuguang,academicianoftheChineseAcademyofEngineeringandchairmanoftheChinaEngineeringBlastingAssociation,listenedtothebriefingandreviewrequirementsoftheProvincialPublicSecurityDepartmentandtheMunicipalPublicSecurityBureauontheblastingproject,andintroducedtheconstructionplanoftheGuangdongZhongrenGroup.Afterquestioninganddiscussion,thereviewopinionswereputforwardandtheMunicipalPublicSecurityBureauwasapprovedtoapprovetheconstructionoftheproject. Inordertoensurethesafetyandsuccessoftheblastingdemolitionproject,theZhongshanMunicipalGovernmenthasspeciallysetupacoordinationheadquarters,whichisresponsiblefort
Call for papers on participation in the "6th International Conference on Explosives and Blasting Technology of China, Japan and Korea"
Allrelevantunits:   The6thInternationalConferenceonExplosivesandBlastingTechnologyofChina,JapanandKoreawasscheduledtobeheldinSouthKoreafromOctober12to16,2011.Theconferenceincludedexplosives,detonationequipment,geotechnicalblasting,mineblastinganddemolitionblasting. Inordertostrengtheninternationalacademicexchangesandtechnicalcooperation,theChinaEngineeringBlastingAssociationisnowissuingnoticesofessaystorelevantunitsanddepartments.Expertsfromenterprises,institutions,researchinstitutesanduniversitiesarewelcometosignupandactivelycontributetotheconference.   Theessaycontentisasfollows:   1.Callforpapers:   TheauthorisaskedtofirstsubmitanEnglishabstractofabout200to400words(includingthetitleofthearticle,author,unit,contactnumberande-mail)andkeywords. Thebestchoiceis3to5keywords.   Second,thedraftschedule:   (1)DeadlineforsubmissionofEnglishabstracts:July20,2011   (2)DeadlineforsubmissionoffulltextinEnglish:September10,2011   Third,themodeofsubmission:   PleasesendtheEnglishabstracttotheemailaddress:cseb@cseb.org.cnormingxiuzhu@yahoo.com.cn   Contact:ZhuMingxiu   Contactnumber:(010)88399565   Fax:(010)68344564   Contactaddress:No.1WenxingStreet,Xizhimen,Beijing100044
Seven years of honing the "Blasting Net" sharp display
Time of issue : 2019-05-30 10:01:00
TheCoalIndustryPublishingHousepublishedthenewbook"ThePracticalManualforCoalMineBlasting"publishedinApril2008,andintroducedthedetailsof"ZhongboNet"intheentiresectionofChapter23ofChapter23,fullyaffirmingitssafetytothecoalmineblastingindustry.Informationproductionplaysanimportantrole.   ItisenoughtoprovethatundertheleadershipoftheChinaEngineeringBlastingAssociationandthestrongsupportoftheblastingassociationsofvariousprovincesandcities,aftersevenyearsoftempering,intheeraofrapiddevelopmentofinformationtechnology,"ChinaBlastNetwork"hasbecomeChinawithoutanydispute.Theforerunnerofthedevelopmentofinformationizationintheengineeringblastingindustryhasbecomethelinkoftheinformationtransmissionoftheblastingindustryandthecivilexplosiveequipmentindustryandtheinformationcenterfortheacquisitionofrelevantinformation.   "ChinaBlastNetwork"hasbeenrecognizedbytheindustryasthefirstportalsiteoftheblastingindustry. Theloudandmeaningfulnameof"BlastingNet"isonceagainrevealed!   ChinaBlastingNetworkEditorialDepartment   April10,2009

Copyright@ 2002-2018 gzbpw Inc. All Rights Reserved Guizhou blasting network Copyright
Reproduction, abstraction, reproduction or mirror-building are prohibited without authorization.

Website Construction:Motivation of Chinese Enterprises   Guiyang    Guizhou ICP No. 11000840